Office: 46, Inside Chota Sonapur,
M.S. Ali Road, Behind A.P. College. Mumbai - 400 008.
Mon - Sat : 09.00 AM - 10.00 PM

Precision Raised Flooring for Modern Workspaces

Design, manufacturing, and installation of durable raised floor systems—engineered for performance and built to last.

Engineering Precision
Built for Durability
Bespoke Solutions
After‑Sales Support
About Parmar Traders

About Us

We are a specialized Raised Floor / False Floor manufacturer and installer delivering engineered systems for data centers, offices and control rooms.

ISO‑grade QA Engineering‑led On‑time Delivery
30+
Years Experience
150+
Projects
Our Services View Projects

Our Services

End‑to‑end solutions—from design to installation.

Raised Floor Design
Raised Floor Design

Custom planning to meet load, cabling, and airflow needs.

  • Load & airflow modeling
  • Cabling route planning
  • BOM & specifications
Learn more
Manufacturing
Manufacturing

Complete range of stringers, pedestals, and panels manufactured to precision tolerances for raised flooring systems.

  • Heavy duty & seismic pedestals
  • Cross head pedestals (C01-C04 series)
  • Standard & specialized stringers
  • Custom height configurations
  • Galvanized & coated finishes
  • ISO-grade quality assurance
Learn more
Installation
Installation

Experienced team delivering safe and on‑time execution.

  • Method statements & HSE
  • On‑schedule delivery
  • Clean handover docs
Learn more

Why Choose Us

Engineered flooring systems with strict QA, safe installation practices and reliable after‑sales support—built for mission‑critical spaces.

Get a Free Quote
Engineering First

Load, airflow and cable routing planned up‑front.

Quality Assured

Factory‑grade checks and documented handovers.

On‑Time Delivery

Detailed schedules and experienced site teams.

After‑Sales Support

Responsive service and optional AMC coverage.

Recent Projects

A glimpse of our recent installations.

Data Center
Data Center
Data Center Infrastructure

Heavy‑duty raised flooring with cable management and airflow optimization for mission-critical operations.

2023
Data Center
Data Center Infrastructure

Heavy‑duty raised flooring with cable management and airflow optimization for mission-critical operations.

Corporate Office
College stage
College stage

college stage flooring installation and maintenance work done by our team.

2023
College stage
College stage

college stage flooring installation and maintenance work done by our team.

Control Room
Control Room
Control Room Fit‑Out

High‑precision leveling with anti‑static finish for mission-critical operations.

2022
Control Room
Control Room Fit‑Out

High‑precision leveling with anti‑static finish for mission-critical operations.

Get a Free Quote

Tell us about your space and we’ll propose an engineering‑backed specification with timelines and cost.

  • Engineering‑backed specification
  • Transparent pricing
  • 24–48h response
Data protected 30+ years experience
By submitting, you agree to our basic data usage for contacting you.
WhatsApp